For teams that build · Belgrade

Precision.
Made visible.

CAD drawings. Quantities. Construction documents.

Conceptual architectural composition in optical glass
Explore services

Your project.
In detail.

From a single sheet to technical preparation for your site.

CAD drawingsDWG / PDF

From PDF to a working DWG.

Organised layers, dimensions and sheets.

  • Start with a PDF, sketch or existing DWG
  • Vector drawings, organised layers and dimensions
  • DWG + PDF delivery within the agreed scope
Explore the service
Busway route planDWG → PDF
Technical documentationXLSX / PDF

Clarity in completed works.

Measurement books and interim certificates in Serbian formats.

  • Start with measurements and information from the contractor
  • Measurement books and interim certificates in Excel
  • As-built sheets for your responsible engineer to sign
Explore the service
Floor screed drawingm² / m³
Quantities & estimatesRSD / m² / m³

Every quantity accounted for.

Take-offs, measurements and estimates from your documents.

  • Quantities by work item from PZI documentation
  • Units, descriptions and measurement methods
  • Rates from your quotations or agreed sources
Explore the service
Plastering schemeRSD / EUR
BIM / RevitRVT / IFC

More clarity in three dimensions.

A model from 2D documents, with quantity exports.

  • Models from your 2D drawings to an agreed level of detail
  • Architecture and structure
  • Model and quantity exports as agreed
Explore the service
Conceptual architectural composition in optical glass2D → 3D

Built on
real work.

Examples of working documentation. Open a sheet to see the details.

All work

Clear pricing.
Before we begin.

A price list in dinars. Scope, cost and deadline agreed before work starts.

PDF → DWG1.200RSD

A3 sheet

Quantity take-off from PZI2.000RSD

sheet

Measurement book + interim certificate36.000RSD

month / site, up to 50 items

EXPO 2027EXPO 2027BELGRADE · SERBIA

A city growing.
Details matter.

EXPO 2027 is Belgrade’s next major milestone. Let’s prepare the documents for your deadline.

Until EXPO 2027 opens

00days
00hours
00minutes
00seconds
15.05 — 15.08.2027
Market figures and sources
Serbia785,37bn RSD

Value of completed construction works · 2025 · preliminary

Source ↗ · 03.08.2026
Belgrade region291,24bn RSD

Value of completed construction works · 2025 · preliminary

Source ↗ · 03.08.2026
€ 17,8 bn

Serbia 2027 programme · 323 projects

€ 1,2 bn

Planned value of the Surčin site

100+

Domestic subcontractors · January 2026

ASPECT / Next step

Let’s start
with your project.

Write whenever it suits you. We can agree every detail in messages.